After hours, Mayer Building Comapny trenched and re-installed reinforced concrete maintaining existing slab integrity.  For the existing conditions, we were required to do excessive back-filling . We installed the appropriate vapor barrier . After the GC self performed most of the work, we furnished and installed the custom, if a little tricky,  acoustical tile ceiling at the new Swim & Sport location in Lakeside Mall.