Health & Wellness

OPSO Trailer Medical Trailer Relocation

In March 2016, MBC completed a tricky little project for the Sheriff’s Office. The work consisted of breaking down the post-K medical trailer that had been stationed near the old OPP and setting it up in the new jail complex. The work consisted of the major trades that always constitute our work. After moving the trailers and “mating” them back together. We reconnected mechanical lines (sewer & water), electrical service and installed a new roof membrane. We completed foundation carpentry, trim carpentry and flooring patches. We built an ADA accessible ramp and landing, wood stairs, steel handrails and painted all the repairs. Not only did Mayer Building Company deliver satisfactory work to a new client, but also once again demonstrated that we can complete projects in unconventional spaces, with unconventional restraints, that most GCs could not.

Read More

Interior Improvements at Clinic

In November 2014, Mayer Building Company delivered select interior improvements to a mental health clinic in Algiers. The work, which was performed after hours included several new first class millwork stations, new flooring, modification of a conference/group flex room, installation of new doors, window treatment, and paintworks. Outside the building, we installed utility services for a mobile unit.

Read More

Site Prep and Improvements for Health Industry

In June 2014, MBC completed a job for a Louisiana State’s health care agency in St. Bernard Parish. Among the many tasks accomplished, we successfully removed old concrete foundations and graded out a new crushed concrete parking lot, replaced 2 package units on the roof of the building, carefully removed the finishes in the building, replaced broken storefront, installed a new 300 Amp electrical service, planted several trees and over forty feet of garden.

Read More

Nimble Improvement at River Oaks

In June 2014, Mayer Building Company delivered a small project at River Oaks Hospital. The job consisted of installing a new rated door and wall, modifying existing casework and matching all the River Oaks finishes. Our forces quickly and quietly installed the work to the satisfaction of the owner, all the while maintaining safety and respect for the occupants, staff and environment.

Read More

New Orthopedics Clinic

Mayer Building Company is pleased to announce the successful completion of a new medical clinic for Pontchartrain Orthopedics and Sports Medicine in St. Charles Parish on time and under budget. Pontchartrain Orthopedics and Sports Medicine opened the new facility at 14041 U.S. Highway 90 in early October 2013. This project consisted of interior and exterior improvements by converting a dilapidated masonry building into a contemporary, stylish, but understated new doctor’s office.

Read More

Pontchartrain Orthopedics & Sports Medicine

Mayer Building Company completed in April 2013 an overhaul of a portion of the Pontchartrain Orthopedics and Sports Medicine clinic in Metairie. The work, which was performed while the clinic was in operation was phased. Phase 1 included the renovation of the “Cast Room,” an addition of a new storage room, a new billing office and conference room. Each of these rooms was decorated in the contemporary mode with monochromatic paints and millwork, a matching base and resilient floor.

Phase 2 included expanding the Physical Therapy Room to a more open arrangement with new clean, modern ceiling tiles and grid, matching a durable, but attractive carpet tile and building four new exam rooms, a new ADA bathroom and updating the main reception and the staff”s break room.

Read More

Animal Care Center

In Kenner, Mayer Building Company delivered a roof, canopy and parapet renovation for the Animal Care Center, a veterinary clinic on David Drive. We came up with very cost-effective systems for new roof line, parapet, and cementious panel canopy.

Read More

Interior Repairs at Anytime Fitness

In early fall 2012, Mayer Building Company provided a quick repair package to the Anytime Fitness on Canal Street. The gym, which had been affected by the 2012 storm, required a nimble and attentive crew to furnish and install sheetrock, vinyl base, ceiling tiles and paint in a few minorly damaged areas. The finish package we delivered turned out to be a satisfactory match, but what was just as important for this job was our operating procedures. The job at Anytime, which is open to the membership public 24-7, needed much temporary protection, extreme cleanliness, and customer-service flexibility. Mayer Building Company afforded all of these things.

Read More

Commercial Space Conversion

MBC turned over a low-voltage upgrade and space conversion for a commercial developer before our deadline in March 2010. The new tenant, the US Department of Veterans Affairs , will use the space for a clinic.

Read More

Testimonials

Mayer Building Company, LLC | | 504-315-8423 | [email protected]